| |
TEST
FACILITIES |
|
|
|
The GPCL test facilities available for EMC compliance testing
are as follows:
|
|
|
|
| Pre-Compliance
|
| |
Four 3-meter Semi-Anechoic Chambers
constructed of steel and lined with ferrite tiles which permit measurements without
outside adverse effects and with more accurate internal control. These chambers
are designed for preliminary radiated emissions and final immunity testing.
|
|
|
|
3-meter Semi-Anechoic Chamber
|
|
|
|
Final Compliance
|
| |
One 5-meter Semi-Anechoic Chamber
constructed of steel and lined with ferrite tiles and RF absorber
cones. It is designed for radiated emissions and immunity testing
and meets the site attenuation requirements of ANSI C63.4, EN 55022, and
field uniformity requirements of EN 61000-4-3/IEC 61000-4-3.
|
|
|
|
5-meter Semi-Anechoic Chamber
|
|
|
|
|
|
|
|