Information typically required for testing
Instructions
The following information is required to prepare for testing. Even if equipment will be undergoing
only an initial evaluation, product developers new to the compliance
environment may benefit by reviewing these requirements.
-
Description
Brief description of the
Equipment Under Test (EUT), including Official name and
model number. What does the machine do? Use a
descriptive sentence from advertising literature.
-
Intended Environment
Where will the EUT be installed and used? In what
environments (e.g., residential, commercial. light industry, or heavy
industry) will it be located?
-
Physical Size and Weight
-
How many units make up the EUT?
-
What are its dimensions and weight?
-
Is the floor loading reasonably well
distributed?
-
Test Requirements
-
What standards will be applied? Regulatory
agency, special (e.g., Telcordia) or initial evaluation
(no compliance) measurement?
-
What tests will be
performed? What limits will be applied?
-
What severity levels will be used when
performing immunity testing (if applicable)?
-
Test System
Block diagram of system under test and supporting equipment
(can be hand drawn).
Diagram should show what is in the test area and what is outside the test
area. It should include cables, EUT, and peripherals.
-
Cabling
Cable diagram or list of cables including cable lengths of system under test.
Are the cables shielded, non-shielded, twisted pairs, or other?
-
Power
-
What are the power requirements (line voltage
and current) for the EUT and support equipment?
-
How many power cords are there for the EUT and support
equipment?
-
What type of power connectors are used?
(Give range: 50 Hz - 60 Hz required.)
-
Grounding
List any special grounding requirements.
-
Auxiliary Equipment
List any equipment required to operate
or serve as loads for the EUT.
-
Modes of Operation
-
How will the EUT be operated?
-
How many modes will be tested?
-
How many line voltages are required for the
test?
-
When only one mode is to be tested,
provide rationale for selecting that mode. Example: This mode exercises all
circuits and draws the most power from the power source.
-
Configurations/Ports
-
How many EUT configurations will be tested?
(Use typical installation practices or regulatory requirements
such as ANSI C63.4 for FCC tests.)
-
How many ports are there and how will they be
used?
-
Is there shielding on the EUT signal ports, plug-ins, shelves, nodes, etc?
-
Failure Modes
-
A definition of what constitutes a
failure. How will the errors
be identified and monitored?
-
What is the performance degradation criteria
for immunity tests? (State level: none, brief
shutdown, keep within specs, etc.)
-
What is the critical error that will show
performance degradation at an unacceptable level?
-
How do you monitor this performance
degradation? (e.g., via test set, remote simulation, etc.)
-
Do you need special methods to monitor
performance degradation? (e.g., via cameras, lighting,
hardwire telemetry, etc.)
-
ESD Test Points
A diagram or photograph of EUT showing
the ESD test points. (CE testing only.)
-
EUT Frequencies
List all
clock/data frequencies.
-
Software/Firmware
Will special test software be necessary to
populate CRT and data transmission?
-
Security
What are your security requirements? Must EUT be hidden or
camouflaged while at GPCL/ETG?
-
Other Considerations
If you have support or monitoring
equipment that will not be in the test chamber with your EUT, are
the cables to that equipment at least thirty feet long?
|
|